Data Solutions for the Agriculture and Sustainability Value Chain
Thalavam builds pipelines that take data from the field, the lab and the supplier’s inbox and turn it into governed enterprise assets. This page covers five problems we solve and how each solution works.
EUDR and Deforestation Compliance Data
The problem
The EUDR requires geolocation for every plot and evidence that land was not deforested after 31 December 2020. Plots above 4 hectares need a polygon, and a single invalid geometry can break a submission. Large and medium operators must comply from 30 December 2026.
What we do
- Repair invalid polygons (self-intersections, unclosed rings) and normalise coordinates to WGS-84 using PostGIS.
- Compare plot boundaries with Sentinel-2 imagery to flag tree-cover change after the cut-off date.
- Export hashed dossiers with scene IDs and methods, formatted for EU TRACES or your sustainability platform.
- Offer a no-login upload link so exporters and cooperatives can submit plots with little friction.
LimitsSatellite analysis supports due diligence but does not replace it. Cloud cover and mixed land use can lower confidence, and results below a threshold go to human review.
Scope 3 and ESG Data Engineering
The problem
For many food and agriculture companies, supply-chain emissions are the hard part to measure, and the evidence is trapped in PDFs, receipts and spreadsheets.
What we do
- Extract and validate data from invoices, utility bills and fertilizer logs with OCR and schema-checked LLM extraction.
- Map data to the GHG Protocol and IPCC emission factors, with a primary-versus-secondary data quality score.
- Flag missing periods, duplicate bills and outlier intensities before an auditor sees them.
- Align outputs to CSRD, ISSB and India BRSR reporting fields.
Agri-Biotech R&D and Field-Trial Intelligence
The problem
Seed, bio-input and crop-protection trials produce data in separate labs, spreadsheets and weather systems, so cross-season questions take weeks to answer.
What we do
- Build an agricultural knowledge graph that links genetics, soil, weather and trial yield.
- Provide a natural-language query layer in which every answer links to the underlying trial record.
- Expose governed data to internal AI agents through an MCP server.
Climate Risk, Water and Geospatial Intelligence
The problem
Annual ESG reports don’t capture drought, heat or moisture stress as they happen.
What we do
- Monitor vegetation and moisture indices across registered sourcing regions.
- Map water stress at parcel and district level.
- Push alerts to ERPs, trading desks or lending platforms via webhooks, Snowflake or Databricks, or WhatsApp digests for cooperatives.
Cloud and Embedded AI Engineering
The problem
Many companies have a lakehouse and an AI strategy, but no reliable path from field data into them.
What we do
- Modernise data operations on AWS, Azure, GCP, Databricks and Snowflake.
- Run 6-week fixed-scope proofs of concept for data and sustainability teams.
- Add governance: lineage logs, human-in-the-loop review and a documented API.
Find your starting point
Which solution do you need?
| Your situation | Start with |
|---|---|
| You export coffee, cocoa, rubber, timber or similar to the EU | Solution 1 |
| Your Scope 3 numbers come from spend-based estimates | Solution 2 |
| Your trial data sits in many files and systems | Solution 3 |
| Your sourcing regions face drought or heat risk | Solution 4 |
| You have data but no pipeline into your cloud | Solution 5 |
FAQ
Solutions questions
What is the EUDR cut-off date?
31 December 2020. Products must come from land not deforested after that date.
Do I need a polygon for every plot?
Plots above 4 hectares need a polygon. Smaller plots can use a point with six decimals, according to current guidance. Check the latest EU guidance with your legal adviser.
Can Thalavam replace my ESG software?
No. It supplies clean, verified data to the platform you already use.
Next step
Not sure which one fits?
Tell us what you are stuck on. We will reply with a clear next step, which may be a call, a sandbox run or a scoped proposal.
Talk to an engineer